Search

7 results:
25.03.2025

Steinenvorstadt

… be enriched by catering and retail space on the ground and basement floors. Construction Date 2026 Construction Date 2026 Commissioning 2027 Commissioning 2027 ~ Floor Space m2 4 000 ~…

03.09.2024

Grand Passage

… and lake views, a roof terrace and an inner courtyard. Grand Passage Construction Date 2026 (in stages)

23.06.2025

Traineeship

… complete. We will be happy to receive your application for the internship starting on 1 September 2026 again from February 2026.

06.02.2025

Route de Meyrin

… on an interim basis until the start of construction. Type of Use Residential Construction 2026 Commissioning 2028 ~ Nutzfläche m2 14 300

04.02.2025

Rheinstrasse 54

… from the centre of the municipality of Augst. Type of Use Residential Construction Date 2026 Commissioning 2028 ~ Floor Space m2 7 500 Well connected and close to nature, the area lends…

03.02.2025

Maaglive

… centre - a place where people enjoy spending time. www.maaglive.ch Construction Date from 2026 Construction Date from 2027 Commissioning 2028  Commissioning 2028  ~ Floor…

31.08.2021

Solid first half-year 2021

Our Chairman of the Board of Directors, Ton Büchner, and CEO, René Zahnd, reflect on the first half of 2021 and provide a glimpse into the future. Swiss Prime Site posted good results in the first

LinkedIn Copy Link